CSCS Managers & Professionals (MAP) Mock Test
Targeted revision across 106 statutory & supervisory UK HSE questions covering CDM 2015 duty holders, RIDDOR 2013, LOLER 1998, Control of Asbestos Regs 2012, Noise/Vibration action levels, and environmental compliance.
CSCS Managers & Professionals (MAP) Simulator
Practise high-level UK construction legislation, risk management, and site supervision duties.
Under the Health and Safety at Work etc. Act 1974, what is an individual site operative legally required to do?
0% (0 / 0)
Score Breakdown by UK HSE Syllabus Topic
Question-by-Question Review & Explanations
Key Statutory Numbers Tested in MAP
| UK Regulation | Key Statutory Threshold / Duty |
|---|---|
| CDM 2015 (F10 Notice) | Notifiable to HSE if construction exceeds 30 working days + >20 simultaneous workers, OR exceeds 500 person-days. |
| HASWA 1974 s.2(3) | Written Health & Safety Policy legally required when employing 5 or more employees. |
| RIDDOR 2013 | Deaths/specified injuries/dangerous occurrences: report without delay (written within 10 days). Over-7-day injury: within 15 days. Over-3-day: internal record. |
| LOLER 1998 Reg 9 | Thorough examination every 6 months (lifting people + all accessories) and every 12 months (other lifting plant). |
| Noise & Vibration Regs 2005 | Noise: 80 dB lower / 85 dB upper / 87 dB limit. HAVS: 2.5 m/s² EAV (100 pts) / 5.0 m/s² ELV (400 pts). |
| Oil Storage Regs 2001 | Secondary bund containment must hold at least 110% of the largest tank (or 25% total combined capacity). |
Frequently Asked Questions
Who sits the CSCS Managers & Professionals (MAP) HS&E test?
Site managers, project managers, quantity surveyors, architects, civil engineers, and health & safety advisers applying for CSCS Black Manager Cards or White Academically/Professionally Qualified Person (AQP/PQP) cards take the CITB HS&E Managers & Professionals (MAP) test.
How does the Managers & Professionals (MAP) syllabus differ from Operatives?
While covering core construction site hazards, MAP places heavier focus on statutory duties under CDM 2015 (Principal Designer, Principal Contractor, F10 notification, Construction Phase Plan), RIDDOR 2013 reporting timescales, LOLER thorough examinations, R&D asbestos surveys, health surveillance, and legal enforcement notices.