Skip to main content
UK CITB HS&E REVISION · 2026 SYLLABUS · INDEPENDENT FREE PRACTICE RESOURCE
WAHR 2005

Working at Height, Ladders & Scaffolding Practice Test

Falls from height remain the single biggest cause of fatal injuries in UK construction. Master the Work at Height Regulations 2005 hierarchy, ladder rules, scaffold inspections, and fragile roof safety.

WAHR 2005 18 Questions · Pass 17/18 (90%)

Working at Height & Scaffolding Quiz

Practise all 18 focused UK HSE questions in Study Mode or switch to Timed Exam Mode.

Q 1 / 18 Working at Height, Ladders & Scaffolding
Score: 0/0

Under the Work at Height Regulations 2005, what is the correct hierarchy of control for work at height?

Must-Know UK Statutory Figures for This Topic

1:4 (75°)
Safe leaning ladder ratio (1 out for every 4 up)
≥ 1 metre
Minimum ladder extension above landing (≈ 3 rungs)
Every 7 days
Max scaffold inspection interval (≥2m fall risk)
950 mm / 150 mm
Min main guardrail height & toe board height

UK HSE Revision Summary

Hierarchy of Control (WAHR Reg 6)

Always follow Avoid → Prevent → Mitigate. Eliminate work at height where practicable; if unavoidable, prioritise collective protection (guardrails, scaffolds, MEWPs) ahead of personal fall-arrest harnesses.

Ladders & Stepladders (INDG455)

Ladders are NOT banned, but must only be used for low-risk, short-duration tasks (under ~30 mins). Maintain 3 points of contact, keep your belt buckle inside the stiles, tie at the top, and never paint wooden ladders.

Scaffolding & Mobile Towers

Only trained scaffolders may erect or alter scaffolding. Never climb a red-tagged or incomplete scaffold. Before moving a mobile aluminium tower, remove all people and tools and push from the base.

Fragile Roofs & Rescue Plans

Never step directly onto fibre-cement sheets or roof lights. Any task using a personal fall-arrest harness MUST have a prompt on-site rescue plan to prevent suspension intolerance.

Frequently Asked Questions

Are ladders banned on UK construction sites under WAHR 2005?

No. Ladders and stepladders are permitted for low-risk, short-duration work (typically up to 30 minutes) where a risk assessment shows safer access equipment is not reasonably practicable.

How often must a construction scaffold be inspected?

Before first use, at intervals not exceeding 7 days, and after any event likely to affect strength or stability such as high winds, heavy storms, vehicle strike, or structural alteration.